Traffic route changes on Pulaski Barracks

Traffic route changes on Pulaski Barracks

by: US Army Garrison Rheinland-Pfalz Directorate of Emergency Services | .
USAG Rheinland-Pfalz | .
published: June 20, 2016

From June 21 through July 7 (estimated), the Pulaski main gate will be closed for exiting traffic. During this time, at least one lane will be opened for traffic entering the post. Traffic is encouraged to enter the Kapaun gate during this time (the Kapaun gate is open 6 a.m. to 6 p.m.). The exit gate on Pulaski at the commissary/shoppette will remain unaffected.

Also, June 21-30 (estimated), the area next to the auto crafts building will be under construction. All traffic entering Pulaski will need to take the first right after the entrance and circle back up and around (going up the hill and then taking a left at the dental clinic).

 

Tags: Gate, traffic, Closure, Detour, Kapaun, Garrison, Army, Barracks, Pulaski
Related Content: No related content is available